Case Studies
Real-world results from Dana Pipe inspection solutions in the field.
Municipal
67% reduction in emergency repair incidents
April 20, 2026
Municipal Asset Management Program Saves City $2.4M Annually
A mid-sized municipality implemented a systematic CCTV inspection program using Dana Pipe DP-C200 crawlers, reducing emergency repairs by 67% in the first year.
Read Case Study → Industrial
12 critical defects identified before shutdown
March 15, 2026
Industrial Plant Pipeline Inspection Program
A chemical processing plant used DP-C600 Heavy-Duty crawlers to inspect 8 km of large-diameter process lines, identifying critical defects before a scheduled shutdown.
Read Case Study →